14 hours ago

38 hours ago

47 hours ago

Public meeting scheduled to discuss zoning modifications for development of Daniel Bagley Elementary School

...public is invited to discuss the development plans for Daniel Bagley Elementary School located at 7821 Stone Ave N. The meeting will be held on Wednesday, April 25 at 6 p.m. at Green...

This article has 1 other Seattle location (Show)

...be held on Wednesday, April 25 at 6 p.m. at Green Lake Elementary School, 2400 N. 65th St. The Seattle School District is requesting modifications (known as a “departures”) from select City zoning...

    Public meeting scheduled to discuss zoning modifications for development of Daniel Bagley Elementary School - Front Porch
    The public is invited to discuss the development plans for Daniel Bagley Elementary School located at 7821 Stone Ave N. The meeting will be held on Wednesday, April 25 at 6 p.m. at Green Lake Elementary School, 2400 N. 65th St. The Seattle School District is requesting modifications (known as a "departures") from select City ...
    http://frontporch.seattle.gov

4 days ago

6 days ago

News roundup: Zoo names sloth bear cubs, S Spa moving, PNA jobs, city meetings about school renovations

...Elementary School, 2400 N. 65th St., about proposed renovation plans at Daniel Bagley Elementary School (7821 Stone Ave. N.), which require zoning departures, including increased building height and fewer than required on-site parking...

This article has 5 other Seattle locations (Show)

S Spa is moving from 8011 Greenwood Ave. N. to Edmonds.

...hosting a public meeting at 6 p.m. Wednesday, April 18, at Cascadia Elementary School, 1700 N. 90th St., about proposed zoning modifications to the adjacent Robert Eagle Staff Middle School (1330 N. 90th...

...N. 90th St., about proposed zoning modifications to the adjacent Robert Eagle Staff Middle School (1330 N. 90th St.) to reduce the setback for field lighting. You can comment at the meeting, or in...

...a community meeting at 6 p.m. Wednesday, April 25, at Green Lake Elementary School, 2400 N. 65th St., about proposed renovation plans at Daniel Bagley Elementary School (7821 Stone Ave. N.), which require...

Previous post: Department of Construction and Inspections approves rezone of 7009 Greenwood Ave. N. from 40 feet height to 55 feet for housing project

    News roundup: Zoo names sloth bear cubs, S Spa moving, PNA jobs, city meetings about school renovations
    Here's a roundup of various news in the neighborhood and beyond. Woodland Park Zoo has finally named its 15-week-old male sloth bear cubs: Deemak and Kartick. You can get updates on the cubs here, and see video of them here. The Phinney Neighborhood Association is still looking for a Ballard Preschool Co-op Teacher and a Ballard Preschool Co-op Parent Educator.
    https://phinneywood.com

Apr 10

Apr 09

Apr 08

  • Construction permit

    Construct alterations to finish basement in existing single family residence, subject to field inspection (STFI).

    1140 N. 83rd St. Issued April 6, 2018 Comment

Apr 08

Apr 08

Apr 07

Apr 06

Apr 05

Apr 03

Apr 02

Apr 01

Mar 29

Mar 28

Mar 28

Mar 25

Mar 24

Mar 19

Mar 18

  • Construction permit

    Construct interior alterations to main floor bathroom and second level closet. Subject to field inspection (STFI).

    8239 Interlake Ave. N. Issued March 16, 2018 Comment

Mar 15

Mar 13

Mar 12

Mar 12

Mar 06

Feb 28

Feb 27

Daniel Bagley Elementary School Construction Update And Input Needed

One item of interest was that the design team, including the traffic consultant, was unaware of the pending move into the buildings on the SE corner of 77th and Aurora of the Mosaic Church, along with its potential 400 church members (and cars).

    Daniel Bagley Elementary School Construction Update And Input Needed
    One of Green Lake's schools, Daniel Bagley Elementary School, is slated for large scale renovations beginning next year. The updates are centered around anticipated increase in enrollment and the aging building. (For more background, check out the link to the timeline of the project.) A recent meeting addressed design and construction updates but also announced...
    https://www.seattlegreenlaker.com

About

EveryBlock collects 17 types of news in Seattle — including articles, real estate listings, meetups and conversations neighbors are having — and organizes it by location. Here is all the recent news and discussion near 7900-7999 Stone Ave. N.

Upcoming events

Sat

Thu

View full calendar →

Thousands of neighbors connect and get their news via EveryBlock, including:

TIMOTHY CROSLEY Candy darekmazzone Gordon Klug Sheila Talwar Laura Meerkatz Doug McMillen Lyle George Whitney Nielsen Maxwell Jerome Chroman

You're 60 seconds from creating an account and joining them…

or
Enter your email address

7900-7999 Stone Ave. N.